October 2025 Patch Tuesday3441087Normal patch window

SAP · 3441087

Linked CVE review

Assess and apply SAP security advisory 3441087

Linked CVEs
1
Confirmed exploited
0
PoC or lab evidence
0
Maximum CVSS
5.4
Evidence is kept separate

Confirmed exploitation, public exploit material, EPSS probability and CVSS severity answer different questions. “No confirmation recorded” means the checked sources do not currently confirm exploitation. It is not proof that exploitation has not occurred.

Reset
1 of 1 linked CVEs shown
Confirmed exploitedCVSS above 9.0
CVE and descriptionSeverityExploit realityForecast and accessRemediation
CVE-2025-42984 Scheduled assessment
Missing Authorization check in SAP S/4HANA (Manage Central Purchase Contract application)

SAP S/4HANA Manage Central Purchase Contract does not perform necessary authorization checks for an authenticated user. Due to this, an attacker could execute the function import on the entity making it inaccessible for unrestricted user. This has low impact on confidentiality and availability of the application.

5.4 · CVSS 3.1 · MediumSource: CNANo confirmation recordedNo CISA KEV match was present at the last successful refresh. This means no confirmation from that source, not proof of no exploitation.None recordedNo exploit-tagged reference or CISA SSVC proof-of-concept state is currently recorded. Research may still exist outside the structured feeds.EPSS: 0.26% · 16.6th percentileForecast date: 2026-10-08NETWORK · LOW complexity · LOW privileges · NONE user interactionScheduledMedium technical severity with no CISA KEV confirmation; remediate through the normal risk-based patch cycle unless local exposure raises the priority.Awaiting fix. No fixed version is explicitly recorded in the structured CVE data.